Showing posts with label Renovations. Show all posts
Showing posts with label Renovations. Show all posts

Saturday, September 4, 2010

This is where I used to scrap...update

3 comments
Just a little update on the scraproom renovations.
It was a loud long week filled with jackhammers, air nailers, and loads of banging. This meant very short to no naps for the boys and I ( we're trying to catch up this week-end). We finally have the drains in for the bathroom, the floor re-poured, the sub-floor down, the walls and insulation up, and those pesky air ducts boxed in.
The cabinet designer has gone back to the drawing board to accommodate the changes in the bulkhead height, and the higher than anticipated floor. When he asked me if I mainly used the space by myself, and I told him I planned on having friends over on a regular basis, he laughed and asked how tall they all were...

So girls- no growing past 5'8" ok?
We'll drink lots of lattes to stunt our growth...at least vertically :P

 view looking from back "studio" wall towards bath/laundry
This is the view from the laundry into the "studio"

Monday to Wednesday next week, we're expecting the electrician and the plumber (as well as the new plans so we can be sure to get enough plugs and lighting where we need them). The next step will be to finally get the cabinets into production, and get all the drywall up- ughh more dust!

I think the computer area is going to now be located on the longest wall opposite the door. It just makes more sense because of the bulkhead. I've also agreed to drop the counter height down to 34' to give more space between upper and lower cabinets ( and because we've all solemnly vowed not to grow any taller...)

On a different project note, Mark went to get the paint today for Parker's new room. We're hoping he has time to start it tomorrow or Monday. ( today was all used up getting haircuts for both boys, and new indoor shoes for our preschooler...sigh)

The colours even sound bright and fun. Just imagine Morning sunshine ( soft yellow) on the upper half of the walls, white chair rail and Carrot stick ( bright orange) on the lower half. We plan on filling the space with the crib/toddler bed he has for now, and the dark green armoire and night stand. We're also on the lookout for Elephants, giraffes, zebras, monkey's and other fun animals to decorate with.



Have a great week-end

Thursday, August 19, 2010

This is where I used to scrap...Groan!

3 comments
They finally came and did the temporary install for the washer and dryer yesterday, but with the duct work being rerouted, I'm only able to get in there at night to do anything. It's going to take a few days to get caught up on laundry- good thing we don't plan on leaving the house while they are working, or I'd need more than mismatched outfits for the boys.


Did I tell you that I used to work in telecommunications? for a few years I was responsible for managing  equipment required on site for fiber optic rings ( systems) and working with installation crews to make sure everything and everyone arrived on time. I processed emergency orders, movement of material from site to site and final reconcillation and billing- blah blah blah...what I'm getting at is that I've worked with a lot of installers, lots! So I'm not surprised at the following events.

Long story made short- there were water pipes in the way, and the guys asked me if it was okay if they passed the duct work on the other side of them. In the same breath they added " we don't really have a choice" ( in their best Quebecois). Maybe it's because I'm native New Brunswicker -LOL, but what I understood, and what they were planning were two totally different things. Not only does the bulk head pass along the entire length of back wall, they passed it through the side wall of the back room which is going to be the laundry/bathroom- right where the shower should sit.
ARRRRGGGGGHHHH!
I'm sure it's going to require more material, and add a few more hours onto the job, but they have no choice but to move the ducts to go around the outside of the room ( which was the original plan) and replace the studs they chopped down in the side wall.

Did I mention they chopped one of my motions sensors for the alarm off the wall? I got a call from our security company yesterday asking if everything was ok- only to descend into the basement and find one guy with the motion sensor in hand- he thought it was wireless, and that he could just move it.

We also had a small drip of a leak in a drain pipe in the furnace room. it's been there since we moved in, and we've had a bucket under it. Yesterday the bucket got moved when the washer and dryer got relocated. No one knew to put it back where it was.
No biggie...until someone also knocked the drainpipe, and turned our small drip drip into a trickle.

Now I'm waiting for the electrician and the plumber.

wish me an uneventful day!

on a positive note, I got my photos back yesterday! WHOOOHOOO!!
as I copied them over to my desktop, I kept seeing stuff I forgot I had, and feeling even more grateful that I hadn't lost them all forever- all 22,000+ photos! I won't complain of not having any photos to scrapbook for a long, long time!

Here's my scraproom in much earlier glory days:





Monday, August 16, 2010

This is where I used to scrap...update

4 comments
I may bore you all to tears, but I'm going to try to post photos of my scrap space as it evolves, and record the headaches that come along with the renovations. It's really too bad I don't have any photos of how it really used to look- I think I may find some of those when our recovered photos are here.

The demolition is done, and measurements taken for the ductwork. The cabinet design is done, and just needs fine tuning...good thing I asked about the height of the countertops this morning, or everything would have been at desk height. ( I'm used to standing at countertop height). That little hiccup will change quite a few measurements, and possibly rule out upper cabinets along the long wall under the ductwork. I'm still unsure, but I think The counter height and lots of drawer space is more important.

So girls wanna see what happened to our space? (speaking to my cropping buddies)


This was it last Thursday:



That was early in the morning, after Mark and I finished emptying it. The yellow room if you don't recognize it is the back room that was filled with books and movies ( and boxes of books and all the other junk we haven't found a home for yet).

This is what it looked like Thursday afternoon:



And what it looks like today:

This is the view standing at the back wall of the back room ( which is all one big room for now)

 And this one from where my computer used to be- looking at the back room.

( if you look closely you'll see my abandoned and much needed washer and dryer stored in the furnace room- the guys were supposed to come this afternoon to hook them up temporarily...I'm still waiting!)

The real work will start only at the beginning of September, so unless I scan in some design plans, there shouldn't be any more updates until then.


Now I just need to figure out how to scrapbook a 12 x 12 page in an 8 x 8 space....